RecordsTQT does thisGoes with every qualification
Records go with the work.
Paper trail
PQR · WPS · WPQ · WOPQ
Every qualification ends in a signed record. The PQR proves the procedure, the WPS writes it down, and the WPQ proves the welder. Each one points back to the one before it, so an inspector can follow the chain from the welder to the test.
How the sample records link up
PQRPQR-001The test weld and its results.Lab no. TQT-EX-0001
Supporting PQR: PQR-001
WPS followed: WPS-001
The recipe binder. Test-kitchen notes, the recipe card, and each cook's sign-off, filed together so anyone can check the dish was made right.
The samples
Our forms, filled in
These are the TQT Lab versions of the ASME Section IX forms, filled with example data for a fictional company. Pick a record to see what's on it and what to check.
Sample only. Example data for fictional Example Fab Co., welder Joe Welder and operator Jane Operator. Not a real qualification.
Follow the chain
Where each record points
An auditor checks that every link matches. If a number doesn't line up, the record doesn't hold up.
| Record | Field to check | In our samples | Must match |
|---|---|---|---|
| PQR | Lab No. | TQT-EX-0001 | The test report from our lab |
| WPS | Supporting PQR No.(s) | PQR-001 | A PQR on file that covers the WPS ranges |
| WPQ | WPS Followed During Welding of Coupon | WPS-001, Rev. 0 | The WPS the welder will use |
| WOPQ | WPS Followed During Welding of Coupon | WPS-002, Rev. 0 | The orbital WPS the operator will run |
One PQR can support several WPSs, and one WPS can have many welders qualified to it. Keep them filed together.
What you get
The paper that leaves with each job
PQR · QW-483
Signed test record
Your procedure's actual values with our tensile and bend results. PDF, plus a hard copy.
5–7 days typicalWPS · QW-482
Finished WPS
A PDF, plus a hard copy. Small corrections included.
5–7 days typicalWPQ · WOPQ · QW-484
The welder's card
What the welder or operator is qualified to weld, with the test results. PDF, plus a hard copy.
5–7 days typicalNDT
Inspection report
Acceptable or rejected for each weld, against your code.
VT, PT, MT same day · report 5–7 business daysCalibration
Calibration certificate
As-found and as-left readings for each welding machine. Recalibrate yearly.
About calibration →Material testing
Test results
Results against your spec, ready for your records.
About material testing →Who keeps it
The records belong to who paid
The employer keeps the card.
A WPQ doesn't follow the welder to a new job. The employer who paid for the test keeps the qualification, so a new employer usually requalifies the welder.
PQRs and WPSs belong to your company. Under ASME Section IX a PQR doesn't expire as long as the procedure doesn't change beyond what it covers.
Schools are the exception.
With the student's signed authorization, we confirm and release their certifications to a prospective employer.
Questions
About your records
How long until I have the paperwork?
Typically 5–7 days. Expedite Service is 3–5 days (+$50) and Rush Service is 1–2 days (+$200). Ask when you book or call.
Can you fix a name or detail on a card?
Check the Welder Qualification Form before you send it. We use it to make the certification. Changes after the paperwork is processed have a $50 reprocessing fee.
Does a welder's card go with them to a new job?
No. The employer who paid for the test keeps it. Schools can release a student's certifications with the student's signed authorization.
I lost our copy. Can you send another?
Yes. Call or email with the lab number and we'll send the PDF again. It's $25 per page.
How long do you keep our records?
Indefinitely. We have records going back to 1999.
Start the paper trail.
It begins with a test coupon. We'll take it from there.