RecordsTQT does thisGoes with every qualification

Records go with the work.

Paper trail

PQR · WPS · WPQ · WOPQ

Every qualification ends in a signed record. The PQR proves the procedure, the WPS writes it down, and the WPQ proves the welder. Each one points back to the one before it, so an inspector can follow the chain from the welder to the test.

5–7 daystypical · Expedite Service 3–5 days · Rush Service 1–2 days
In the kitchen

The recipe binder. Test-kitchen notes, the recipe card, and each cook's sign-off, filed together so anyone can check the dish was made right.

The samples

Our forms, filled in

These are the TQT Lab versions of the ASME Section IX forms, filled with example data for a fictional company. Pick a record to see what's on it and what to check.

PQR · QW-483Sample PQR page 1 on the TQT Lab QW-483 form for fictional Example Fab Co., PQR-001: joint, base metal, filler, position, preheat, gas and electrical values.Open PDF ↗

Sample only. Example data for fictional Example Fab Co., welder Joe Welder and operator Jane Operator. Not a real qualification.

Follow the chain

Where each record points

An auditor checks that every link matches. If a number doesn't line up, the record doesn't hold up.

RecordField to checkIn our samplesMust match
PQRLab No.TQT-EX-0001The test report from our lab
WPSSupporting PQR No.(s)PQR-001A PQR on file that covers the WPS ranges
WPQWPS Followed During Welding of CouponWPS-001, Rev. 0The WPS the welder will use
WOPQWPS Followed During Welding of CouponWPS-002, Rev. 0The orbital WPS the operator will run

One PQR can support several WPSs, and one WPS can have many welders qualified to it. Keep them filed together.

What you get

The paper that leaves with each job

PQR · QW-483

Signed test record

Your procedure's actual values with our tensile and bend results. PDF, plus a hard copy.

5–7 days typical

WPS · QW-482

Finished WPS

A PDF, plus a hard copy. Small corrections included.

5–7 days typical

WPQ · WOPQ · QW-484

The welder's card

What the welder or operator is qualified to weld, with the test results. PDF, plus a hard copy.

5–7 days typical

NDT

Inspection report

Acceptable or rejected for each weld, against your code.

VT, PT, MT same day · report 5–7 business days

Calibration

Calibration certificate

As-found and as-left readings for each welding machine. Recalibrate yearly.

About calibration →

Material testing

Test results

Results against your spec, ready for your records.

About material testing →

Who keeps it

The records belong to who paid

The employer keeps the card.

A WPQ doesn't follow the welder to a new job. The employer who paid for the test keeps the qualification, so a new employer usually requalifies the welder.

PQRs and WPSs belong to your company. Under ASME Section IX a PQR doesn't expire as long as the procedure doesn't change beyond what it covers.

Schools are the exception.

With the student's signed authorization, we confirm and release their certifications to a prospective employer.

Certificate Release Form (PDF) ↗

Questions

About your records

How long until I have the paperwork?

Typically 5–7 days. Expedite Service is 3–5 days (+$50) and Rush Service is 1–2 days (+$200). Ask when you book or call.

Can you fix a name or detail on a card?

Check the Welder Qualification Form before you send it. We use it to make the certification. Changes after the paperwork is processed have a $50 reprocessing fee.

Does a welder's card go with them to a new job?

No. The employer who paid for the test keeps it. Schools can release a student's certifications with the student's signed authorization.

I lost our copy. Can you send another?

Yes. Call or email with the lab number and we'll send the PDF again. It's $25 per page.

How long do you keep our records?

Indefinitely. We have records going back to 1999.

Start the paper trail.

It begins with a test coupon. We'll take it from there.